Park 12

Silver! (66 Points)
LEED® FOR HOMES v3.0  13059
MULTI-FAMILY • MID-RISE
LEED® CAMPUS PROJECT
LEED® BD&C v3.0

Client

Greystar
Architect
Carrier Johnson + Culture

General Contractor
Turner Construction • Greystar
Structural Engineer
DCI Engineers

Civil Engineer
Kettler Leweck Engineering

Mechanical Engineer
MA Engineers • FDG Consulting Engineers
Electrical Engineer
Michael Wall Engineering • FDG Consulting Engineers
Plumbing Engineer
MA Engineers
Landscape Architect
LRM Landscape Architecture

Green Accomplishments

• Integrated building design that exceeds California’s Energy Standard by a minimum of 15.1%

• Project is located within ½ mile of 5 public and rapid bus lines, for better public transportation

• Located within a ½ mile area of 10 basic community services for residents

• Project provides 5% of preferred parking spaces for low-emitting and fuel-efficient vehicles

• High efficiency plumbing fixtures to conserve drinking water

• Installed low-flow water fixtures reducing indoor water demand by 44.75%

• Achieved 51.39% irrigation water use reduction with high efficiency irrigation and drought-tolerant plants

• HVAC and exhaust design ensure an energy efficient and well ventilated building

• Quality air sealing and insulation installation implemented to reduce envelope leakage and HVAC loads

• All flooring systems provided are FloorScore® or CRI Green Label Plus

• Improved indoor air quality with adhesives, sealants, paints, and insulation to meet LEED® VOC and Formaldehyde limits